Nobi · Historical Archive

The Nobi Workshop Log

Twenty-two entries from the NEURA project, April through August 2026. Read the original account alongside the current context and evidence limits below.

Week 22August 30, 2026

The Last Day

Historical entry: The school-project closeout and advertising plans.

Read the log →
Week 21August 21, 2026

Down to the Millimeter

Historical entry: Reported enclosure-fit work, materials, and drop experiments.

Read the log →
Week 20August 14, 2026

The Story, Not Just the Robot

Historical entry: The original advertising and product-message work.

Read the log →
Week 19August 7, 2026

When Software Dies, You Print

Historical entry: Reported shell printing and informal drop experiments.

Read the log →
Week 18July 31, 2026

The Week the Machine Quit

Historical entry: Voice-command work, image generation, and a computer failure.

Read the log →
Week 17July 24, 2026

Ready for the Camera

Historical entry: Voice controls, expressions, video, and prototype movement.

Read the log →
Week 16July 17, 2026

Making It Hear and Speak

Historical entry: Transcription, voice output, and a headset setup.

Read the log →
Week 15July 10, 2026

The Robot Wakes Up

Historical entry: Reported Raspberry Pi startup and motor-controller work.

Read the log →
Week 14July 3, 2026

Never Going Silent

Historical entry: Offline fallback and reliability goals.

Read the log →
Week 13June 26, 2026

Personality and a Smarter Brain

Historical entry: Personality, tool calling, and semantic memory.

Read the log →
Week 12June 19, 2026

Neura Cloud, Part Two

Historical entry: The cloud relay and reported security review.

Read the log →
Week 11June 12, 2026

Neura Cloud, Part One

Historical entry: Accounts and the proposed cloud key vault.

Read the log →
Week 10June 5, 2026

Neura in Your Pocket

Historical entry: The mobile interface and installation work.

Read the log →
Week 9May 29, 2026

The Nervous System

Historical entry: The hardware interface, internal protocol, and firmware.

Read the log →
Week 8May 22, 2026

Teaching It to Act, Not Just Talk

Historical entry: The skills system and separate robot and computer modes.

Read the log →
Week 7May 15, 2026

Giving Neura a Face and a Voice

Historical entry: Onboarding, expressions, voice, and memory.

Read the log →
Week 6May 8, 2026

Pitch, Jira, and the Final Design Doc

Historical entry: The pitch, roadmap, and design document.

Read the log →
Week 5May 1, 2026

Building Toward OpenClaw Security

Historical entry: The proposed permissions model for community skills.

Read the log →
Week 4April 24, 2026

Upgrading the AI Layer with Ollama

Historical entry: Model providers, local inference, and fallback routing.

Read the log →
Week 3April 17, 2026

Locking In the Architecture

Historical entry: The monorepo and separation of the server and interface.

Read the log →
Week 2April 10, 2026

Shipping the Core Engine

Historical entry: The core engine, local browser app, and version control.

Read the log →
Week 1April 3, 2026

Picking the Hardware and the Stack

Historical entry: Hardware choices and the original software plan.

Read the log →